This article reflects the City of Vancouver’s published guidance as of early November 2026. Building by-law requirements change, so confirm how the rules apply to your project with the City or your design team.
Vancouver’s 2025 Building By-law changed how renovation work in existing buildings is treated, and the change commercial tenants and owners will notice first is a construction-value threshold. Smaller fit-outs no longer trigger structural or non-structural upgrades, and larger ones now have those upgrades limited to the tenant’s own space.
Here is what changed, where the relief stops, and what to check before you price a tenant improvement in the City of Vancouver.
Vancouver’s 2025 Building By-law, number 14343, took effect on September 15, 2025 and reorganized the rules for work in existing buildings. Under the new rules, a renovation project is no longer required to make structural or non-structural upgrades where its construction value is under $255,000.
The City’s own worked example in its Guide to 2025 VBBL Updates is a commercial tenant planning $180,000 of interior improvements. Under the new rules, that project triggers no structural or non-structural upgrade work outside the suite.
Above the threshold, the relief does not disappear so much as shrink in scope. The by-law now limits structural and non-structural upgrades in a tenant renovation to the tenant space itself, rather than pulling in building elements beyond the suite. The council report behind the change describes the aim as reducing scope creep on improvements to existing buildings, and notes that the proposal was aligned with feedback from the Building Owners and Managers Association.
What it means: for many office, clinic and retail fit-outs, the 2025 rules remove a source of cost and uncertainty that used to appear late in design. It also makes the construction value and the suite boundary two of the most important numbers to pin down early.
The upgrade triggers still exist, and a change of major occupancy is the one most likely to catch a project by surprise. Under the by-law’s upgrade mechanism, where work changing a building’s major occupancy adds up, over five years, to more than 50% of the building area in a single-storey building or more than 100% in a building of more than one storey, the whole building must be brought to the highest fire, structural, non-structural and accessibility levels in Part 11.
Two exemptions matter for smaller suites:
What it means: if your business is moving into a space with a different use, such as retail to medical clinic or office to restaurant, have the change-of-occupancy question assessed before you sign the lease. It is the one trigger that can reach the entire building.
For minor interior renovations in office buildings, the City’s Tenant Improvement Program (TIPs) remains the quicker path. Any commercial office building whose construction permit was applied for after January 31, 2007 is automatically on the eligible list, as are buildings designed to the 2007 Vancouver Building By-law or a newer edition. Eligible tenants skip a new development permit and receive an expedited field review and inspection.
The City aims to complete an initial review and make contact within 5 to 10 business days. Applications are handled in the order received, and incomplete ones are returned for resubmission. The program page includes a map for checking whether a building qualifies.
What it means: confirming TIPs eligibility before drawings are finalized is the cheapest step in the whole sequence. For how permits fit into the overall project, see our guide from permits to occupancy.
These rules apply in the City of Vancouver. Other Metro Vancouver municipalities follow the BC Building Code and their own processes. See our locations page for the areas we serve.
Hallmark Projects builds office, clinic, retail and restaurant tenant improvements across Metro Vancouver. We can help you establish construction value early, confirm the suite boundary and permit route, and flag occupancy-change risks before you commit to a lease.
Planning a fit-out in Vancouver? Contact us to review your space.